Connect the grounded end of the cable, Connect ungrounded end of the cable – Rockwell Automation 1756-IF4FXOF2F ControlLogix High-speed Analog I/O Module User Manual

Page 61

Advertising
background image

Rockwell Automation Publication 1756-UM005B-EN-P - January 2013

61

Install the Module

Chapter 4

Connect the Grounded End of the Cable

1.

Ground the drain wire.

2.

Connect the insulated wires to the field-side.

Connect Ungrounded End of the Cable

1.

Cut the foil shield and drain wire back to the cable casing and apply shrink
wrap.

2.

Connect the insulated wires to the RTB, as shown below.

IMPORTANT

We recommend you ground the drain wire at the field-side. If you
cannot ground at the field-side, ground at an earth ground on the
chassis as shown below.

20104-M

a. Remove a length of cable

jacket from the Belden cable.

b. Pull the foil shield and bare drain

wire from the insulated wire.

c. Twist the foil shield and drain

wiretogether to form a single
strand.

d. Attach a ground lug and apply

heat shrink tubing to the exit
area.

20918-M

e. Connect the drain wire to a chassis

mounting tab. Use any chassis
mounting tab that is designated as a
functional signal ground.

4M or 5M (#10 or #12)
Star Washer

4M or 5M (#10 or #12)
Phillips Screw and Star
Washer (for SEM screw)

Chassis Mounting Tab

Drain Wire with Ground Lug

Advertising