Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 139

Advertising
background image

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

139

FactoryTalk EnergyMetrix Software Meter and Tag Setup Chapter 7

The Real Energy Net, Reactive Energy Net, and Real Power Demand tags are automatically copied with each device.
Change the device name and meter name as shown in the table.

For the

Efficient Industries Plant 1

example,

the electric meter listing should look like this.

Meter

Parent Group

Device

Name

Production 1

Electricity

Production 1

Production 1 Meter

Production 2

Electricity

Production 2

Production 2 Meter

Shipping/Receiving/DC

Electricity

Shipping/Receiving/DC

Shipping/Receiving/DC Meter

Copied meters

TIP

Remember that the device class must be the same in the source and copied meters, otherwise the meter tag
addressing will be incorrect in the copied meter.

Advertising