Load configuration view – Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 416

Advertising
background image

416

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

Chapter 13 Time of Day Control

Load Configuration View

Click on the wrench button from the toolbar to display the load configuration view.

Faceplate Toolbar

Load Number to Configure

TOD Control Mode

Commands

Holiday Enable/Disable

Time and Date

Time of Day Schedule

Day of the Week to Configure

Button

Icons

Description

Alarm

The alarm button indicates an alarm condition and activates alarm diagnostic views. A grey bell

indicates normal status, with no alarms. A red flashing bell indicates an alarm condition.

Home

The Home button lets you view the status of all 16 loads.

Clock

The Clock button displays the Time and Date Configuration View, which lets you update the PLC

clock

Calendar

The Calendar button displays the Calendar Configuration View, which lets you assign holidays.

Help

The Help button provides information for the existing view.

Close

Click the Close button to close the faceplate.

Load Number

The load currently being displayed/configured. To select a new load for configuration, click on

the load number to launch the numeric keypad input object. Enter a load number from 1…16,

then click Enter.

Load Description

Click on the load description to launch the keypad input object and enter a description for the

load. When a description change is made, the Save Day Changes button background will turn

yellow, indicating that a change has been made, but has not been saved. The description change

will not take effect until it is saved. Click on the Save Day Changes button to save the change.

TOD Control Mode

Click on the Mode Selection button to toggle between TOD Control, Override On, and Override

Off modes. When a mode change is made, the Save Day Changes button will turn yellow,

indicating a save is required. The mode change will not take effect until saved.

Copy/Paste

Commands

To copy the schedule from the displayed day to another day, click Copy Day. Select a new day,

and then click Paste Day. Click Save Day Changes to download the changes to the controller.

Save Command

Click Save Day Changes anytime a change is made to the load configuration. You must save your

changes prior to selecting a new day or a new load to configure. If you select a new day or new

load prior to saving your changes, the changes will be lost.

Undo Command

To revert to the previously saved schedule for the day, click Undo Day Changes. You can only

undo changes if they have not been saved. Once saved, you cannot revert to the previous

schedule.

Advertising