Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual
Page 273

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014
273
FactoryTalk View ME Energy Faceplates
Chapter 11
8. Add a JSR to your main routine, or other desired location, to execute the new routine.
9. Open the new routine that you just created.
The communication path for the message instruction in rung 1 needs to be configured with the port number for the
DeviceNet scanner and the node address for the E3 Plus.
a. Click on the ellipse in the E3Plus_CommsAux_Rev6_AOI instruction next to the Ref_MSG1 input.
b. Click the Communication tab.
c. Add the 193-DNENCAT port number and your E3 Plus node address to your path configuration in the
following format: _DeviceName, 3, #.
The communication path for the message instruction in rung 6 also needs to be configured with the port number for
the DeviceNet scanner and the node address for the E3 Plus.
d. Click on the ellipse in the MSG instruction in rung 6.
TIP
DeviceName - the name of the EtherNet/IP Communications Auxiliary Module
3 - the port number of the DeviceNet Scanner of the EtherNet/IP Communications Auxiliary.
5 - the node address of the E3 Plus Overload Relay.