Mount and bond the power rail, Mount and bond, The power rail – Rockwell Automation 1768-L43 CompactLogix System Quick Start User Manual

Page 79

Advertising
background image

Publication IASIMP-QS003B-EN-P - October 2009

79

Prepare the Kinetix 6000 Multi-axis Servo Drive System Chapter 6

Mount and Bond the Power Rail

2094-PRS1 through 2094-PRS8

The Kinetix power rails support one integrated axis module (IAM), and up to seven axis
modules (AM), or shunt modules (SM). The connector pins for each slot on the power rail are
covered by a protective boot. Do not remove the protective boot until you install the
modules.

1. Layout the position for

your power rail in the
enclosure.

2. Attach the power rail to

the cabinet using M6 (1/4
in.) bolts, making sure the
power rail is properly
bonded to the cabinet.

3. Bond the power rail to

the enclosure subpanel
using the ground strap
provided.

4. Tighten all mounting

fasteners.

Boot

Ground Stud
with Braided
Ground Strap

Bonded
Cabinet
Ground

Advertising