Metrohm tiamo 1.0 Manual User Manual
Page 668

644
Configuration
Next GLP test
Select date, [GLP test date + 999 days ]
Date on which the next GLP test is to be carried out. This date can be se-
lected by pressing
in the dialog window
Select date
(see General pro-
gram functions - Edit - Select date). When a date has been entered the
value for
GLP test interval
will be automatically adapted.
Action
If the time interval for the GLP test has expired then one of the following actions
will be triggered automatically both at Start test (see Single determinations or De-
termination series) and during the command sequence:
Record message
The message that the GLP test interval has expired will be automatically
saved with the determination.
Display message
A message will appear and you can choose whether to continue the run or
terminate it. If the run is continued then the message that the GLP test in-
terval has expired will be automatically saved with the determination.
Stop determination
The running determination will be automatically terminated. The following
message must be confirmed with
[OK]
.