Delaying the start of a run – Dako Autostainer User Manual

Page 88

Advertising
background image

88

Dako Autostainer

|

User Guide

Total buffer
calculation

Gray scroll bar

Delaying the Start of a Run

Starting a staining run at a later time.

1. Select the gray scroll bar and hold the left mouse button down. Move the scroll bar to the

right until the desired Start Time and Finish Time is displayed. Release the mouse button.
The staining run will start and finish at the times indicated.














NOTE: The total amount of buffer is calculated and

displayed below the scroll bar.

2. Select

the

PRIME PUMP (Water) button. A dialog box appears asking if the pathway is

clear for the arm to move.

Select the YES button. The Autostainer calibrates the reagent dispensing mechanism and
primes the water dispensing pump.

Select the NO button and the SET START TIME window is displayed.

NOTE: The “01” hardware version of the Dako Autostainer does not have an additional
reservoir for deionized water. If your Autostainer does not have this option the software
does not prompt to prime the water pump.

3. Select

the

PRIME PUMP (Buffer) button. The buffer dispensing pump is primed.

Gray scroll bar
used to adjust
start time in large
increments.

Scroll arrow used to adjust
start time in small
increments.

Advertising