Grounding the controller to the grounding bar – KEYENCE LS-3100/3100W Series User Manual

Page 11

Advertising
background image

5

2. Ground the controller. (Except for models followed with “W”.)

Grounding the controller to the
grounding bar

3. Check first that the power switch of the controller is OFF, then connect it to

the outlet using the supplied power cable.

Controller (rear view)
LS-3100 Series

LS-3100(W) Series

4. Check that laser can be safely emitted, then turn the power switch ON.

Allow the controller to warm-up for approximately 30 minutes after the
laser emission indicator LED has lit.
With the LS-3100(W) series, first turn on the POWER switch (at the rear),
and then turn on the LASER switch (on the front panel).

Controller (front view)
LS-3100 Series

LS-3100(W) Series

CHAPTER 1 Preparation for Measurement

Grounding the
controller through the
grounding outlet

I

O

LIMT

HIGH

GO

LOW

LASER

LASER

1

2

LASER SCAN DIAMETER

OFFSET ZERO HOLD LOCK POSITION

mm

inch

SEG

SET

MODE

AVE

LIMIT

OFS

PRM

FNC

CAL

PROG

DISP

7

4

1

0

8

5

2

.

9

6

3

+/-

ZERO

HOLD

CLR

ENT

LASER

LS

LIMT

HIGH

GO

LOW

LASER

LASER

1

2

LASER SCAN DIAMETER

OFFSET ZERO HOLD LOCK POSITION

mm

inch

SEG

SET

MODE

AVE

LIMIT

OFS

PRM

FNC

CAL

PROG

DISP

7

4

1

0

8

5

2

.

9

6

3

+/-

ZERO

HOLD

CLR

ENT

• OFF

• ON

POWER

LS

08.10.1, 10:49 AM

5

Advertising