Quick setup, Installation procedure, Step by step – Verilink APS 2000 T1 Line Protection (880-502411-001) Product Manual User Manual

Page 25: Installation procedure -1, Step by step -1, Chapter 2, Chapter

Advertising
background image

Verilink APS 2000 User Manual

2-1

Chapter

2

Quick Setup

This chapter provides a step-by-step procedure for installing the
minimum configuration required to begin using the APS 2000.
Complete details on all configuration options are provided in

Chapter 3, "

Configuration".

Installation Procedure

For each node, follow the procedure below.

Step by Step

1. Make sure you have completed all the physical installation

procedures described in the manual

AS2000: The Basics

.

2. If the node has more than one shelf, extend the TABS

controller bus. See the manual

AS2000: The Basics

.

3. Make the connections for each CSU. (See

Connecting the CIMs

).

a. Connect the T1 lines to the CIM NETWORK port.
b. Connect the customer equipment to the CIM EQPT port.
c. Connect the APS priority cable(s).

4. Connect the SLIP and/or Ethernet network management cables

to the CIM 2022 APS in Shelf 1 Slot 1 of the node. (See

Figure 2-2, “Rear view of CIM interconnections”

.)

5. Apply system power.

6. Connect a terminal or PC to the port labelled

C

RAFT

on the front

of the SCC 2120 module. Use one of the two types of Craft
cable:

a. P/N 458-102119-008, DB-9 to RJ-11—(

Figure 1-9

) used with

notebook or other computers which present a DB-9 COM
port.

b. P/N 458-501788-001, DB-25 to RJ-11—(

Figure 1-8

) used with

terminals or computers which present a DB-25 RS-232
connector.

7. Configure your terminal or terminal program for:

a. A data rate of 19.2Kbit/s

b. No parity

c. One stop bit

Advertising