Cycle and reaction times

5.2 Cycle time

CPU 31xC and CPU 31x, Technical data

5-4

Manual, Edition 08/2004, A5E00105475-05

Extending the cycle time

Always make allowances for the extension of the cycle time of a user program due to:

Time-based interrupt processing

Process interrupt processing

Diagnostics and error processing

Communication with PGs, Operator Panels (OPs) and connected CPs (for example,

Ethernet, PROFIBUS DP)

Testing and commissioning such as, e.g. status/controlling of variables or block status

functions.

Transfer and deletion of blocks, compressing user program memory

Write/read access to the MMC, using SFC 82 to 84 in the user program

Ethernet communication via integrated PROFINET interface

CBA communication via PROFINET interface (system load, SFC call, update at scan

cycle check point)

PROFINET IO communication via PROFINET interface (system load)