Siemens Simatic S7-400 User Manual

Page 222

Advertising
background image

Analog Modules

5-6

S7-400, M7-400 Programmable Controllers Module Specifications

A5E00069467-07

5.2

Sequence of Steps from Choosing to Commissioning

the Analog Modules

Introduction

The following table contains the tasks that you have to perform one after the other
to commission analog modules successfully.

The sequence of steps is a suggestion, but you can perform individual steps either
earlier or later (for example, assign parameters to the module) or install other
modules or install, commission etc. other modules in between times.

Sequence of Steps

Table 5-3

Sequence of Steps from Choosing to Commissioning the Analog Module

Step

Procedure

Refer To...

1.

Select the module

Section 5.1 and specific module section from
Section 5.18

2.

With some analog input modules: set
the measuring method and
measuring range by means of the
measuring range module

Section 5.4

3.

Install the module in the SIMATIC S7
network

“Installation” section in the manual for the
programmable controller being used:

S7-400/M7-400 Programmable Controllers,
Hardware and Installation

4.

Assign parameters to module

Section 5.7

5.

Connect measuring sensor or loads
to module

Sections 5.8 to 5.15

6.

Commission configuration

“Commissioning” section in the manual for the
programmable controller being used:

S7-400/M7-400 Programmable Controllers,
Hardware and Installation

7.

If commissioning was not successful,
diagnose configuration

Section 5.16

Advertising
This manual is related to the following products: