Models – Liebert Precision Cooling System DS User Manual

Page 113

Advertising
background image

Piping Schematics

103

Figure 78 Primary connection locations—upflow, air-cooled, 53-77kW (15-22 ton), scroll compressor

models

Point

Description

X

inches (mm)

Y

inches (mm)

Connection Size / Opening

inches (mm)

R1

Refrigerant Access (Top)

83-5/8 (2124)

2 (51)

12 x 4 (305 x 102)

R2

Refrigerant Access (Bottom)

82-3/4 (2102)

14-3/4 (374)

12-3/16 x 4 (310 x 102)

53kW (15 tons)/70 & 77kW (20 & 22 ton)

L1

Liquid Line System 1

94-11/16 (2405)

16-3/4 (425)

1/2 / 5/8 Cu Sweat

L2

Liquid Line System 2

91-7/8 (2334)

16-3/4 (425)

1/2 / 5/8 Cu Sweat

G1

Hot Gas Discharge 1

88-3/4 (2254)

16-3/8 (416)

7/8 / 1-1/8 Cu Sweat

G2

Hot Gas Discharge 2

85-9/16 (2173)

16-3/8 (416)

7/8 / 1-1/8 Cu Sweat

R3

Refrigerant Access (Side)

-

-

6 x 17-3/16 (152 x 437)

CGD*

Condensate Gravity Drain

-

-

3/4 FPT

CPD

Condensate Pump Discharge (Opt)

79-5/16 (2015)

11-7/8 (302)

1/2 Cu Sweat

HUM

Humidifier Supply Line

79-5/16 (2015)

9-7/8 (251)

1/4 Cu Sweat

ECS** Econ-O-Coil Supply

78-5/8 (1998)

7-7/8 (200)

2-1/8 Cu Sweat

ECR** Econ-O-Coil Return

78-5/8 (1998)

4-5/8 (117)

2-1/8 Cu Sweat

E1

Electrical Connection (High Voltage)

75-3/8 (1915)

30 (762)

2-1/2

E2

Electrical Connection (High Voltage)

69-7/8 (1775)

30 (762)

2-1/2

LV1

Electrical Connection (Low Voltage)

19-1/2 (495)

29-1/16 (738)

7/8

LV2

Electrical Connection (Low Voltage)

19-1/2 (495)

30-1/2 (775)

7/8

LV3

Electrical Connection (Low Voltage)

19-1/2 (495)

31-15/16 (811)

7/8

* Field-pitch condensate drain line a minimum of 1/8" (3.2 mm) per foot (305 mm). All units contain a factory-installed condensate trap. Do not
trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must comply with all
local codes.
** Supplied on Dual-Cool systems only (4-pipe system)

Factory Location

Front

CGD*

CGD*

Top View

Left Side Section View

Front Section View

(Left Front Panel Not Shown)

NOTE
1. Drawing not to scale.
2. Tolerance on all piping dimensions
is

±

1/2" (13mm).

3. Field-routed alternatives for refrigerant
gas and liquid line connection points.
4. See submittal page DPN001191 for
blower outlet and deck dimensional data.

4" (102mm)

4"

(102mm)

6"

(152mm)

3-7/8"

(98mm)

17-3/16"

(437mm)

Blower

Outlet

Blower

Outlet

DPN001213
Rev. 1

35"

(889mm)

17-1/16"

(433mm)

98"

(2489mm)

Lv1
LV2
LV3

X

Y

O

14-1/4"

(362mm)

15-7/8"

(403mm)

12-13/16"

(325mm)

All dimensions from
rear corner of unit
including panels

4

4

3

3

3

Advertising