GE Industrial Solutions AF-300 C11 User Manual

Page 25

Advertising
background image

-23-

2-3-4 Connection examples

1) Keypad panel operation

12

V

U

W

13

FWD

11

X1

REV

CM

X3

30C

30B

30A

X2

L1/L

L2/N

L2/S

L1/R

L3/T

3-phase
230V input series
200 to 230V

50/60Hz

P1

N(-)

M

FM

C1

*1 The RUN and STOP keys on the keypad panel can be used to start and stop the operation and the frequency setting POT

(VR) can be used to set a frequency only by connecting the power supply and motor with functions set in the factory.
Forward rotation is set in the factory.

*2 Remove the jumper between the P1 and P(+) terminals before connecting the optional power-factor correcting DC reactor.
*3 Connect the surge absorber in parallel to coils (such as coils of the magnetic contactor and solenoid) near the drive.

MCCB

*2

Frequency setting POT (VR)

STOP

RUN

PRG

RESET

FUNC

DATA

+10Vdc

250

22k

Pulse output

0V

0V

Analog monitor

Alarm output for any fault

PLC

X3

+24 to +27Vdc

INT

EXT

P1

P(+)

When power-factor

correcting

DC reactor is used

E

X3

EXT

INT

PLC

SW7

2

1

Figure 2-3-9 Wiring diagram of keypad panel operation

G

G

4.7k

P(+)

P(+)

Single-phase
230V input series

200 to 240V

50/60Hz

MCCB

3~

Fuse

Fuse

Advertising