GE Industrial Solutions AF-300 C11 User Manual

Page 26

Advertising
background image

-24-

2) External operation

*1

Use this connection to start, stop the operation and set the frequency with external signals. 0 to +10V dc can be set while

function F01 is set to 1 and 4 to 20mA can be set while function F01 is set to 2. Set function F02 to 1~4.

*2 Remove the jum per between the P1 and P(+) terminals before connecting the optional power-factor correcting DC reactor.

*3 Connect the surge absorber in parallel to coils (such as coils of the magnetic contactor and solenoid) near the drive.
*4 Use twisted or shielded wire as control signal wire. Connect the shield to the ground terminal.

12

V

U

W

13

FW

D

11

X1

REV

CM

X3

30C

30B

30A

X2

L2/S

L1/R

L3/T

P1

P(+)

N(-)

P(+)

M

FM

C1

P1

P(+)

When power-factor correcting

DC reactor is used

E

MCCB

*2

Frequency setting POT (VR)

+10Vdc

250

22k

Pulse output

0V

0V

Reverse operation
command

Forward operation

command Forward

Analog monitor

Alarm output for any fault

To 11 terminal

Analog meter

G

G

+24 to +27Vdc

Figure 2-3-10 Wiring diagram of external operation

To ground terminal

To ground terminal

Frequency setting current

input

(4 to 20mAdc)

Frequency setting voltage

input

(0 to +10Vdc)

3-phase
230V input series

200 to 230V
50/60Hz

X3

EXT

INT

PLC

SW7

2

1

4.7k

Single-phase
200V input series

200 to 240V

50/60Hz

STOP

RUN

PRG

RESET

FUNC

DATA

INT

EXT

PLC

X3

L1/L

L2/N

MCCB

3~

Fuse

Advertising