Connecting and turning on the test set – Agilent Technologies Option H48 Multiport Test Set Z5623A User Manual

Page 30

Advertising
background image

2 -14

Agilent Technologies Z5623A Option H48

Installation

Connecting and Turning on the Test Set

NOTE

The test set is shipped from the factory with the GPIB address set to 12.

Connecting and Turning on the Test Set

Make the connections shown in

Figure 2-9, “Detailed Equipment

Connection Diagram.”

The figure shows two RF cables connecting the

network analyzer to the test set. If you intend to verify the performance
of the test set, use the long RF cables listed in

Table 2-3

. Otherwise, use

the short ones.

Plug power cords into the test set. Turn both instruments on.

NOTE

Allow the test set to warm up for at least 2 hours. For the most stable
and accurate measurements, leave the test set turned on at all times.

Table 2-3

RF Cables Connecting Network Analyzer to Test Set

Length

Part No.

Purpose

Long

8120-4781

Verification of test set performance

Short

8120-4782

Measurement of multiport devices

Advertising