Commissioning procedure

Humidification

Water Supply Feed

Indicate on the commissioning sheet how the water is fed to the unit.

·

Mains

·

Feed tank

·

Supply water pressure

Water System

Indicate what features are fitted to the installation.

·

Water strainer

·

Shut off valve

Bottle

Indicate on the commissioning sheet information regarding the humidifier bottle

·

Type

·

Size

·

Code

(e.g. BL0T3A00H0)

Measured

Measure the following information whilst the humidifier is operating.

·

Conductivity

·

Current L1,L2 and L3

1 Amp current approximates to about 1kg/hr of steam output.

Valve Operation

Ensure that the humidifier solenoid valve operates in the following states. Record on
commissioning sheet.

·

Fill

·

Drain

Drain Installation

Check that the humidifier drain is operating satisfactory and that there are no leaks.


Condenser

Check the fan operation on the condenser or dry cooler is correct. Record on the
commissioning sheet the following information.

·

Correct rotation

·

Motor current L1, L2 and L3 (AC Fans only)

·

Fan Speed

Water cooled condenser

Record on the commissioning sheet the following

·

Flow rate

·

Pressure drop

C

omm

iss
ion
ing