Rockwell Automation 1336 8A-48A Fiber Industry User Manual

Page 17

Advertising
background image

2–9

Installation/Wiring

General Grounding

JOG

ESC

SEL

R (L1)

S (L2)

T (L3)

PE

U (T1)

Shield

RIO/DH+

or Analog

Shield*

Common

Mode

Core*

Common

Mode Core*

Conduit/4-Wire Cable

To Computer/Position Controller

(for TE shield ground, see "Control Connections")

Ground per

Local Codes

Motor Frame

Motor

Terminator*

PE

V (T2)

W (T3)

PE/Gnd.

* Options that can be

installed as needed.

Nearest

Building Structure Steel

Single-Point Grounding/Panel Layout

JOG

ESC

SEL

R (L1)

S (L2)

Nearest

Building Structure Steel

To Nearest Building

Structure Steel

Nearest Building

Structure Steel

1336 FORCE

1336 PLUS

T (L3)

PE

TE

Logic

PE

Logic

TE – Zero Volt Potential Bus

(Isolated from Panel)

PE Ground Bus

(Grounded to Panel)

For Programmable Controller
grounding recommendations,
refer to publication 1770-4.1

Important: Grounding requirements will vary with the drives being used. Drives with True Earth (TE) terminals must have a zero potential bus, separate from potential
earth (PE) ground bus. Note that buses can be tied together at one point in the control cabinet or brought back separately to the building ground grid (tied within 3
meters (10 feet)).

Advertising