3 Installation of the Balance

1.

Attach the pan base and pan.

Attach the pan base and pan to the main unit as shown in the figure.

2.

Level the Balance.

Turn the adjustable feet so that the air bubble in the level gauge is within the circle.

3.

Connect the AC adapter.

Connect the AC adapter to the balance.

(Refer to “Section 21, Operate on Batteries” on page 81 if the Batteries option is employed.)

After the balance has been moved, open the windshield door to allow it to
adapt to the ambient temperature for stable measurement.
In addition, allow five minutes after turning on the power for the balance to
warm up.