Cub Cadet SLTX1000 Series User Manual

Page 173

Advertising
background image

Electrical System

167

7.

If the regulator/rectifier fails any one of these tests, replace it with a new one.

8.

Check the D.C. amperage output of the regulator/rec-
tifier using an Ammeter of sufficient capacity or a
D.C. Shunt tool and a volt meter set to read on the
millivolt scale, as described in the TOOLS section of
this chapter.

9.

If the regulator/rectifier passes all of these tests, but
the battery is not charging, check the circuit between
the regulator/rectifier D.C. output (B+) terminal and
the battery positive post for a voltage drop. See
Figure 7.37.

• The harness connector, the 30A fuse, and the hot

post on the starter solenoid all lie between the reg-
ulator/rectifier and the battery.

Test #

Pos. Probe

COM. Probe

Results

1

Housing

B+

O.L. (infinite resistance)

2

Housing

A.C. 1

O.L. (infinite resistance)

3

Housing

A.C.2

> 1.0

Ω (5 second delay)

4

B+

A.C.1

0

Ω (Perfect continuity)

5

B+

A.C.2

> 1.0

Ω

6

B+

Housing

> 1.0

Ω

7

A.C.1

B+

0

Ω (Perfect continuity)

8

A.C.1

A.C.2

> 1.0

Ω

9

A.C.1

Housing

> 1.0

Ω

10

A.C.2

B+

O.L. (infinite resistance)

11

A.C.2

A.C.1

O.L. (infinite resistance)

12

A.C.2

Housing

> 1.0

Ω

Figure 7.37

Advertising
This manual is related to the following products: