Figure 45: reinstalling a dpc – Juniper Networks MX480 User Manual

Page 104

Advertising
background image

Figure 45: Reinstalling a DPC

Reinstalling the FPCs After Installing the MX480 Router with a Lift

To reinstall an FPC (see

Figure 46 on page 81

):

1.

Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
the strap to one of the ESD points on the chassis.

2.

Place the FPC on an antistatic mat, or remove it from its electrostatic bag.

3.

Identify the two DPC slots on the router where the FPC will be installed.

4.

Verify that each fiber-optic transceiver on the PIC is covered by a rubber safety cap.
If it does not, cover the transceiver with a safety cap.

5.

Orient the FPC so that the faceplate faces you.

6.

Lift the FPC into place, and carefully align the sides of the FPC with the guides inside
the card cage.

7.

Slide the FPC all the way into the card cage until you feel resistance.

8.

Grasp both ejector handles, and rotate them clockwise simultaneously until the FPC
is fully seated.

Copyright © 2013, Juniper Networks, Inc.

80

MX480 3D Universal Edge Router Hardware Guide

Advertising