Lanier LP222cn User Manual

Page 465

Advertising
background image

Replacing Consumables and Maintenance Kit

45

Transfer Roller

❒ Be sure to make the maintenance setting using the control panel after replac-

ing the fusing unit. The procedure is complete only when the maintenance set-
ting is made.

A

Turn off the power, and then unplug the power cable.

❒ After power off, wait 30 minutes for the fusing unit to cool before handling it.

B

Open the front cover by pushing the front cover release button.

C

Pinch the connector lever, and then pull out the connector.

Advertising