Table 95 switch sw4, Procedure 40 connecting the cables, Procedure 40 – Nortel Networks NN43001-301 User Manual

Page 264: Connecting the cables

Advertising
background image

264

2.0 Mb PRI implementation

Table 95
Switch SW4

Switch

Down (On)

Up (Off)

SW 4-1

Rx—FGND

Rx—OPEN

SW 4-2

Tx—FGND

Tx—OPEN

Note: The usual method is to ground the outer conductor of the receive
coax signal.

Insert the NTAK79

Slide the circuit card into card slot 1-9 in the Small System main cabinet, or
in slots 11-19, 21-29, 31-39, 41-49 of the first, second, third, and fourth IP
Expansion cabinets, respectively.

Secure the circuit card in the cabinet by locking the lock latch assemblies.
The card number associated with a 2.0 Mb PRI card is based on the slot in
which the card is installed.

Follow the instructions below to connect cables to the NTAK79 PRI card.
Also refer to

Figure 84 "NTAK79 cabling" (page 265)

.

Procedure 40

Connecting the cables

Step

Action

1

In the cabling area, located directly below the card cage, remove
the retaining bar that secures the MDF cables. Connect the
NTBK05DA/CA interface cable to the 50-pin Amphenol connector
below the slot in which the NTAK79 is installed. reinstall the retaining
bar to secure the cable(s) in place.

2

Terminate the NTBK05DA/CA carrier cable as required.

—End—

Nortel Communication Server 1000

ISDN Primary Rate Interface Installation and Commissioning

NN43001-301

02.03

Standard

Release 5.5

7 December 2007

Copyright © 2003-2007, Nortel Networks

.

Advertising