Toshiba CARRIER RAV-SP300AT2-UL User Manual

Page 91

Advertising
background image

– 91 –

No.

…

Part name

Exchange of

electric parts

(Continued)

Procedure

1. Reactor

1) Perform work of Detachment 1 of



,

ƒ

and

„

.

2) Remove the relay connector connected to

the control P.C. board.

3) Cut off the bundling band binding the

compressor lead and the relay connector.

4) Remove each reactor.

(Truss B tight screw M4, 6 mm, 2 pcs. each)

5) Attach a new reactor.

NOTE:

Be sure to bind the removed bundling band with

the bundling band on the market.
Be careful that the fan motor lead does not come

to contact with the reactor body.

Remarks

Reactor relay connector
(Connected to lead wire
(White) at P.C. board side)

Reactor relay connector
(Connected to lead wire
(Charcoal gray) at P.C. board side)

Bundling band
(Compressor lead, reactor lead)

Fan motor lead

Fan motor lead

Fan motor lead

Upper reactor
Connected to reactor relay connector
(Connected to lead wire (White)
at P.C. board side)

Bundling band

Lower reactor
Connected to reactor relay connector
(Connected to lead wire (Charcoal gray)
at P.C. board side)

Advertising