Section 5.3.4,  73), Warning – YSI P 700 IQ Analyzer User Manual

Page 73

Advertising
background image

ba76133e01

09/2013

73

P 700 IQ

Restarting the

measuring operation

6

Carry out the Start measuring function. Measurement is started
and the measured value is displayed in the measured value dis-
play after approx. 5…7 minutes.

7

Carry out the Exit SERVICE function.
or
Exit the calibration and service menu with <ESC>.

8

Confirm the note with <OK>. The measured value display
appears. The measured value flashes.

9

Wait until a measured value is shown in the measured value dis-
play (approx. 5…7 minutes).

10

Switch off the maintenance condition. See IQ S

ENSOR

N

ET

system operating manual.

5.3.4 Maintenance and cleaning work on the open

P 700 IQ

The following maintenance activities have to be carried out manually
while the P 700 IQ is open:

• Changing the liquid containers

• Changing the tube set (T SET)

• Changing the tube of the peristaltic pump

• Cleaning the overflow vessel

• Changing or cleaning the filter membrane

Carrying out

maintenance activities

Proceed as follows to carry out maintenance activities on the open
P 700 IQ:

WARNING

Dangerous chemicals.

Improper use of chemicals can cause damage to your
health.

Heed the following rules:
• Read the labels of the chemicals containers and

follow the safety instructions

• Wear protective equipment (protective goggles,

chemical resistant gloves)

Advertising