Commissioning steps

on the IQ S

ENSOR

N

ET

terminal

The following steps are carried out on a terminal in the IQ S

ENSOR

N

ET

system. Instructions on operation are given in the respective
IQ S

ENSOR

N

ET

system operating manual.

9

Using <>, select the P 700 IQ in the measured value display.

10

Using <C>, switch to the calibration and service menu.
The maintenance condition is activated.

11

Confirm the maintenance condition with <OK>.
The calibration and service menu is displayed. See Fig. 3-22,

46.

Fig. 3-22: Calibration and service menu

12

Carry out the Fill the system function.
All tubes of the P700IQ-PO4 are automatically filled with the con-
nected solutions and sample liquid.

13

Follow the instructions on the display.

Starting the

measurement

14

Carry out the Start measuring function.
The measured value determination takes approx. 5…7 minutes.
A note is displayed.

15

Confirm the start of the measurement with <OK>.

16

Carry out the Exit SERVICE function.
or
Exit the calibration and service menu with <ESC>.
A note to end the maintenance condition is displayed.

If the measurement is delayed because a function with
higher priority (e.g. automatic cleaning or calibration) is car-
ried out before, this is indicated by a message such as
WAIT CLEAN.