YSI P 700 IQ Analyzer User Manual
Page 80
80
ba76133e01
09/2013
P 700 IQ
Tab. 5-5: Tubes of the T-SET (order no 821992B)
for photometer unit with plastic connectors
Maintenance interval
12 months
Preparations
1
Carry out the steps 1…11 in section 5.3.4 Maintenance and
cleaning work on the open P 700 IQ, 73.
2
Disconnect the plug from the P700IQ-PO4
(the heat tracing remains operating).
or
Switch off the analyzer with the power switch.
3
Screw off the empty photometer unit.
4
Carry out the mounting work on a lab table.
5
Remove the plastic cover from the photometer unit.
140
Cell (plastic connection) -
V8 C
1 nut
1 reinforced
120
+
Sample tube 400 mm -
sample
1 luer
400 V11 NC
-
sample tube 120 mm
1 reinforced
1 luer
400
Green (reagent)
VK5 NO -
reagent
1 reinforced
1 luer
400
Orange (calibration
standard)
VK6 NO - calibration stan-
dard
1 reinforced
1 luer
400
Blue (cleaning)
VK6 NC - cleaning solution 1 reinforced
1 luer
500
V8 NO - waste container
1 reinforced
Tube length
(mm)
Color coding
Connection of
Tube ends