3 2-point calibration – YSI P 700 IQ Analyzer User Manual

Page 58

Advertising
background image

58

ba76133e01

09/2013

P 700 IQ

12

Confirm the note with <OK>. The measured value display
appears. The measured value flashes.

13

If necessary, disconnect the terminal from the MIQ/WCA 232.

14

Close the enclosure of the P 700 IQ.

15

Confirm the note with <OK>.
The measured value display appears. While no valid measured
value is available, the display shows bars «- - - -».

16

Wait until a measured value is shown in the measured value dis-
play (approx. 5…7 minutes).

17

Switch off the maintenance condition.
See IQ S

ENSOR

N

ET

system operating manual.

4.2.3 2-point calibration

2-point calibration is not carried out automatically.

A 2-point calibration procedure can be started manually at any time if
necessary. For manual 2-point calibration, the enclosure has to be
opened to connect a second calibration standard.

Proceed as follows to carry out a 2-point calibration procedure:

Opening the enclosure

1

Open the enclosure of the P 700 IQ.

2

If the ambient temperatures are under 0 °C, make sure that the
liquids do not freeze during the calibration procedure.
• Leave the enclosure of the P 700 IQ open for as short a time

as possible

• Only carry out a manual calibration procedure when the inte-

rior of the P 700 IQ is warmed up (15 °C

T

Interior

40°C).

3

For conveniently working on site:
Dock an IQ S

ENSOR

N

ET

terminal onto an MIQ module in the vicin-

ity of the analyzer, or onto the MIQ/WCA 232

module in the ana-

lyzer.

Advertising