YSI P 700 IQ Analyzer User Manual
Page 37
Advertising
ba76133e01
09/2013
37
P 700 IQ
Fig. 3-15: Connection plate on the underside of the housing
6
Screw the connection plate with the preassembled tubes to the
bottom of the housing again. See Fig. 3-15, 37.
1
2
4
5
3
1 Power line
2 Sleeve tube of the suction line
3 Lead-in duct for the IQ S
ENSOR
N
ET
branching (option)
4 IQ S
ENSOR
N
ET
cable
5 Sleeve tube of the return tube
All open cable glands must be closed with suitable plugs.
Advertising