3 changing the tube set (t set), See section 5.4.3, 79) – YSI P 700 IQ Analyzer User Manual
Page 79
ba76133e01
09/2013
79
P 700 IQ
1 Ventilation grid
2 Filter mat
3 Opening for screwdriver
4
Close the ventilation grid.
5
Fold the bearer and close the enclosure lid.
6
Screw the enclosure lid tight with the two screws.
Lower ventilation grid
7
Position yourself under the analyzer enclosure.
8
Open the ventilation grid and exchange the filter mat as with the
upper ventilation grid.
Fig. 5-8: Exchanging the lower filter mat
1 Ventilation grid
2 Filter mat
9
Close the ventilation grid.
5.4.3 Changing the tube set (T SET)
The tubes of the P700IQ-PO4 should be exchanged yearly.
The tube set (T SET) contains the following tubes:
Tube length
(mm)
Color coding
Connection of
Tube ends
35
V7 NC - V8 NC
2 reinforced
35
VK 6C - V11 NO
2 reinforced
35
VK5 NC - V7 C
2 reinforced
35
VK5 C - pump
1 reinforced
50
V7 NO - V11 C
2 reinforced
110
Cell (plastic connection) -
pump
1 nut