3 changing the tube set (t set), See section 5.4.3,  79) – YSI P 700 IQ Analyzer User Manual

Page 79

Advertising
background image

ba76133e01

09/2013

79

P 700 IQ

1 Ventilation grid
2 Filter mat
3 Opening for screwdriver

4

Close the ventilation grid.

5

Fold the bearer and close the enclosure lid.

6

Screw the enclosure lid tight with the two screws.

Lower ventilation grid

7

Position yourself under the analyzer enclosure.

8

Open the ventilation grid and exchange the filter mat as with the
upper ventilation grid.

Fig. 5-8: Exchanging the lower filter mat

1 Ventilation grid
2 Filter mat

9

Close the ventilation grid.

5.4.3 Changing the tube set (T SET)

The tubes of the P700IQ-PO4 should be exchanged yearly.

The tube set (T SET) contains the following tubes:

Tube length
(mm)

Color coding

Connection of

Tube ends

35

V7 NC - V8 NC

2 reinforced

35

VK 6C - V11 NO

2 reinforced

35

VK5 NC - V7 C

2 reinforced

35

VK5 C - pump

1 reinforced

50

V7 NO - V11 C

2 reinforced

110

Cell (plastic connection) -
pump

1 nut

Advertising