IAI America SEP-PT User Manual
Page 92
                                    Advertising
                                    
                                        
                                    
                                
                                 
86
4.2.9 Test (I/O Test and Axis Movement Operation Test)
 
Using this function, the I/O test and axis movement operation test are available.
Touch Initial set in the SEP-PT MENU window.
 
 
 
 
 
 
 
 
Touch the Test
.
When MENU is touched, the SEP-PT MENU window is 
returned.
 
 
 
 
 
 
Select one of I/O Test, or TestPlay and touch it.
 
 
 
 
 
x I/O Test : The PIO input signals can be monitored.
Also, for the output signals, touching OUT0, OUT1, OUT2 or OUT3 turns
ON and OFF the corresponding signal forcibly.
 
 
 
 
 
 
                                    Advertising