This chapter describes the following maintenance tests:

•

Physical Inspection of the Unit

•

Operational Tests

•

Leads Test

•

Heart Rate Display Test

•

Heart Rate Alarm Test

•

Leakage Current Test

•

Shock Test

•

Advisory Test

•

Synchronized Cardioversion Test

•

Pacer Test

•

Printer Test

•

Treatment Report Test

•

SpO

2

Monitor Test

•

EtCO

2

Calibration

•

EtCO

2

Calibration Check

•

EtCO

2

Monitor Test

•

IBP Monitor Test

•

NIBP Calibration Test

•

NIBP Leak Test

•

Deflation Test

•

Inflation Test

•

NIBP Monitor Test

•

Temperature Test

Before You Begin the Maintenance Tests

•

Assemble the tools listed in following section, “Equipment You Need to Perform the

Maintenance Tests.”

•

Keep an extra fully charged Propaq MD battery available.

•

Schedule an hour to conduct the entire maintenance test.

•

Perform the tests in the order presented.

•

Perform all the steps of each test procedure.

•

Complete all the steps of the procedure before evaluating the test results.