Etco, Calibration check – ZOLL Propaq MD Rev A User Manual

Page 37

Advertising
background image

Maintenance Tests

9650-0807-01 Rev. A

Propaq MD Service Manual

33

EtCO

2

Calibration Check

Equipment

5% CO

2

calibration gas cylinder with CO

2

sample line (kit available from Scott Medical

Products, PN 4653ORF-BD)

Note:

If you have previously run the CO2 Calibration procedure, start at step 3.

Do This...

Observe This...

Pass/Fail

1.

On the Propaq MD unit, select
Supervisor>Service>Diagnostic>CO

2

>

Calibration to enter the CO

2

Calibration

control panel.

2.

Connect the Propaq MD unit to the 5%
CO

2

calibration gas cylinder using the

sample line included with the calibration
kit.

3.

From the CO

2

Calibration control panel,

select Verify Calibration.

4.

Activate the calibration gas flow by
pressing the top valve on the calibration gas
canister.

5.

Continue to apply the calibration gas until
the status in the CO

2

Calibration control

panel displays: CALIBRATION GAS CAN
BE REMOVED
.

o

o

6.

Verify that the unit displays:
VERIFICATION DONE - OK.

o

o

7.

Verify that the measured gas reading is
between 4.8 and 5.2 (Vol%).

o

o

8.

Exit out of calibration by pressing the Back

arrow key (

) three times or pressing the

Display/Home button (

).

Advertising