Inflation test – ZOLL Propaq MD Rev A User Manual

Page 45

Advertising
background image

Maintenance Tests

9650-0807-01 Rev. A

Propaq MD Service Manual

41

Inflation Test

Equipment

Dual lumen NIBP hose, stop watch, NIBP simulator

Do This...

Observe This...

Pass/Fail

1.

Verify that the pressure reported by the
NIBP Test control panel or the external
pressure standard system is less than 5
mmHg.

2.

From the NIBP Test panel, use the
navigation keys to select Close Valve.

3.

Select Turn Pump On and immediately
start the timer.

5.

Stop the timer as soon as pressure exceeds
210 mmHg.

Verify the time is less than 7
seconds.

o

o

6.

Select Turn Pump Off, then Open Valve.

7.

Exit the Service Menu and turn off the
unit.

Advertising