Kinze 3200 Wing-Fold Planter Rev. 7/14 User Manual

Page 5

Advertising
background image

TM

Model 3200

M0241-01

6/11

Predelivery/Delivery Checklist

TO THE DEALER

Predelivery service includes assembly, lubrication, adjustment and test. This service helps to ensure planter is delivered
to retail customer/end user ready for field use.

PREDELIVERy CHECKLIST

After the planter is completely assembled, use the following checklist and inspect the planter. Check off each item as it
is found satisfactory or after proper adjustment is made.

Row units properly spaced and optional attachments correctly assembled.

All grease fittings in place and lubricated.

All working parts are moving freely. Bolts are tight and cotter pins are spread.

All drive chains properly tensioned and aligned.

Check for oil leaks and proper hydraulic operation.

Hydraulic hoses are routed correctly to prevent damage to hoses.

Inflate tires to specified air pressure. Tighten wheel lug bolts to specified torque.

All safety decals correctly located and legible as shown in Parts Manual. Replace if damaged.

All reflective decals and SMV sign located as shown in Parts Manual and visible when planter is in transport position.

Safety/warning lights correctly installed and working properly.

Paint all parts scratched in shipment or assembly.

All safety lockup devices are on planter and correctly located.

EdgeVac vacuum fan, analog gauge, and digital gauge correctly installed. All hoses and manifolds connected.

Seed meters performance checked on test stand.

Auxiliary safety chain is properly installed and hardware is torqued to specification.

Planter has been thoroughly checked and to the best of my knowledge is ready for delivery to the customer.

(Signature Of Set-Up Person/Dealer Name/Date)

OWNER REGISTER

Name

Delivery Date

Street Address

Model No. 3200

Serial No.

City, State/Province

Dealer Name

ZIP/Postal Code

Dealer No.

Advertising