Load configuration, Run configuration, Onfiguration – Kinze Ag Leader Integra User Manual

Page 168

Advertising
background image

152

Firmware Version 5.2

The Configuration Setup screen appears. The
appearance of this screen will vary depending upon
your particular operating configuration.

Depending upon your particular configuration, this process may include the following tasks:

1. Equipment Settings

Adjust Implement Switch Settings (if using an implement switch). For more information, see

“Equipment

Settings” on page

79

.

2. Speed Input Setup

For more information, see

“Speed Input Settings” on page

80

.

3. Calibrate Distance

For more information, see

“Calibrate Distance” on page

81

.

4. AutoSwath settings (if using AutoSwath)

For more information, see

“AutoSwath” on page

84

.

5. GPS Offsets

For more information, see

“Vehicle Offsets” on page

85

.

6. Swath Section Offsets

For more information, see

“Swath Section Offsets” on page

86

.

L

OAD

C

ONFIGURATION

Press: Select Event button.

Select a Season, Grower, Farm, and
Field on the Management Selection

screen.

For more information, see

“Setup Event” on page

49

.

R

UN

C

ONFIGURATION

Once a configuration has been completed, the Map View button appears at the bottom of the
Home screen. Press the Map View button to see the Map screen.

30 ft

Vehicle

Massey Ferguson

Massey Ferguson, Tillage

Implement: Tillage

Full Swath:

Sections:

1

Controller: None

Offsets

Configuration Setup

1

Vehicle
Offsets

Speed

Input

Auxiliary

Input

Automatic Swath

Control

Equipment

Settings

Select Event

Advertising