Run time operations, Strip-till (three-bin configuration), Trip – Kinze Ag Leader Integra User Manual

Page 316: Hree, Onfiguration, Perations

Advertising
background image

300

Firmware Version 5.2

The Start Prime button (A) begins the meter prime
routine and each meter shaft will rotate the number
of revolutions as defined on the Air Cart Prime
Screen.

R

UN

T

IME

O

PERATIONS

During Run Time Operations, Strip Till operators can press the Strip Till Control
button to open the Strip Till Control screen. At this screen, you can adjust Product
Density, Conveyor Rate and other settings.

• Each of these settings described below must be set for each individual Product Channel (bin).

• The Product Density, and the Conveyor 1 Rate are all stored with each combination of product and

control channel.

Below is an example of a three channel Strip Till operation setup as a planting configuration.

• (A) Mapping Toolbox

• (B) Product Control Toolbox

• (C) Metering Indicator

• (D) Strip-till Control button

• (E) AutoSwath

• (F) Master Switch Status (on)

S

TRIP

-T

ILL

(T

HREE

-B

IN

C

ONFIGURATION

)

• Strip Till Control button
Displays the status of the product control channel. The Meter Shaft Speed (in RPM) is shown underneath
the bin icon; the Fan Speed (also in RPM) is shown at bottom. When the fertilizer bin is grey no product
application is taking place. When product is being applied, the fertilizer bin icon changes color to green.

1.91

ac

15.0

mph

0.00

MAP

Potash

lb/ac

lb/ac

lb/ac

0.00

0.00
0.00

0.00
0.00

N/A

15

Start

Prime

1

2

3

15

20

3500

1

2

3

RPM

3500

1

RPM

2

3

20

15

15

70.6

ac

9.0

mph

85.00

Wheat

Potash

lb/ac

lb/ac

lb/ac

Superphosphate

85.00

30.00

30.00

30.00

30.00

lb/ac

85

84

1

2

123.4 lb/min

Flow:

80 ft 0 in

100%

20

15

3500

Start

Prime

124 +

104 - 124

84 - 104
64 - 84
44 - 64
0 - 44

Rate

Wheat

15

RPM

1

2

3

Advertising