Kinze Ag Leader Integra User Manual

Page 318

Advertising
background image

302

Firmware Version 5.2

Press: Map button > Strip Till Control button > Static Calibration button

1. Read Static Calibration warning

A warning appears, advising to disable the blower fan circuit and prepare to catch any product dispensed

in an appropriate container. Press

to continue.

2. Select Metering Circuit to Calibrate

The CFR Calibration Wizard appears. Use the drop-down menu to choose the desired channel to calibrate.

Press

to continue.

3. Enter Dispense Amount

Press

to enter the amount of product to be dispensed into the container. Press

to accept

value. Press

to continue.

4. Enter Simulated Target Rate

Press

to enter a simulated target rate, shown in pounds per acres. Press

to accept value.

Press

to continue.

5. Start Target Rate Countdown
Press the start button to begin metering product. The
metering circuit will stop automatically when the system
perceives the simulated target rate has been dispersed.

As the countdown is started, the button will turn red and

state Stop. When the countdown is complete, press

to continue.

6. Enter Actual Dispense Amount
Enter the actual dispense amount, in pounds.

Press

to continue.

Note: The CFR will be calculated from the actual product amount dispensed.

7. Calibration Complete

A message appears, stating that your calibration is complete, and showing the CFR amount, in cubic feet

per revolution. Either:

- Press

to exit the calibration without saving the value.

- Press Repeat Calibration to begin the process again.

- Press

to save the value and exit the calibration routine.

3500

1

RPM

2

3

20

15

15

Static

Calibration

CFR Calibration Wizard: Step 4 of 6

Reset

lb

START

Advertising