Pplication, Trip – Kinze Ag Leader Integra User Manual

Page 315

Advertising
background image

299

A

PPLICATION

S

TRIP

T

ILL

The Strip Till Control screen appears.

Press the Prime button to access the Air Cart Prime
screen.

The Air Cart Prime screen appears with input
buttons for each channel used. The setting
determines the revolutions necessary to prime the
meter shaft. Settings are independent by channel,

and can be entered using

.

(A) Start Prime

(B) Channel 1 Revolutions

(C) Channel 2 Revolutions

(D) Channel 3 Revolutions

Note: Meter Prime routine is not available and remains hidden for ground driven metering configurations.

Channel 1

Channel 2

Channel 3

MAP

Product

Density

Conveyor 1

Rate

62 lb/ft3

0 ft3/rev

Static

Calibration

In-Field

Calibration

Prime

Strip Till Control

Channel 1

Revolutions

0.25

Channel 2

Revolutions

0.25

Channel 3

Revolutions

0.25

1

2

3

Start

Prime

Air Cart Prime

Strip Till Control

Channel 1

Channel 2

Channel 3

Auxiliary

Control Valve Configuration

Single Bin Actuator

Allowable

Error

2 %

Shaft Speed

Calibration

180 pls/rev

Max Metering

Speed

100 rpm

Actuator

Response 1

90 %

Actuator

Response 2

18 %

Response
Threshold

4

Advertising