Commissioning

5-1

L

BA2141 EN 1.0

5

Commissioning

5.1

First switch-on

Please do not change the switch-on sequence explained below!

Stop!

Prior to first switch-on of the controller, check the wiring for

•

Completeness

•

Short circuit

•

Earth fault

Step

Procedure

Remarks

1.

Connect the basic unit and
if available external supply for the fieldbus
module.

•

Onle of the two operating status LEDs at the controller, see

^ 4-1, must be on

or blinking.

If this is not the case, see

^ 7-1

•

The green Vcc display must also be on, see

^ 4-1.

If this is not the case, see

^ 7-1.

2.

Configuration of controllers connected to
the bus

Configure the controllers connected to the bus by means of an appropriate
configuration tool

à

e.g. LONMAKERtfor Windows

®

, see

^ 8-1

3.

It should now be possible to communicate
with the drive.

The yellow bus LED is blinking, see

^ 4-1, when data is exchanged between

the 2141 fieldbus module and other controllers connected to the bus.

4.

Drive-specific settings

à

Operating Instructions of the basic unit

5.

Enable controller

à

Terminal controller inhibit (CINH) = HIGH

6.

Setpoint selection

à

The drive should be running now.