Commissioning, 19 english – Lenze ETMD Tmd frequency inverter User Manual

Page 20

Advertising
background image

19

ENGLISH

Commissioning

Code

Possible Settings

IMPORTANT

No.

Name

Lenze Selection

7

Configuration TRIP
reset (error reset)

0

0

TRIP reset after LOW-HIGH change at
terminal 28, mains switching, or after
LOW-HIGH change at digital input
“TRIP reset”

1

Auto-TRIP reset

• Auto-TRIP reset after the time set in c71
• More than 8 errors in 10 minutes will

trigger

S

fault

WARNING!

Automatic starting/restarting may cause damage to equipment and/or injury to personnel!
Automatic starting/restarting should only be used on equipment that is inaccessible to
personnel.

7

Auto-TRIP reset delay

0.0

0.0

{s}

60.0 See c70

7

Input voltage selection

0

Low (for 200 or 400 V input)

• Lenze setting depends on C93
• During commissioning, confirm

correct setting based on mains voltage

1

High (for 230 or 480 V input)

7

Operating time counter

Display
Total time in status “Start”

0...999 h: format xxx
1000...9999 h: format x.xx (x1000)
10000...99999 h: format xx.x (x1000)

7

Mains connection time
counter

Display
Total time of mains = on

S-ramp integration
time

0.0

0.0

{s}

50.0 • c82 = 0.0: Linear accel/decel ramp

• c82 > 0.0: Adjusts S-ramp curve for

smoother ramp

Skip frequency 1

0.0

0.0

{Hz}

240 • L25 and L26 define the start of the skip

range

• L28 defines the bandwidth of the skip

range

Skip frequency 2

0.0

0.0

{Hz}

240

Skip frequency
bandwidth

0.0

0.0

{Hz}

10.0

Note

Bandwidth (Hz) = fs (Hz) + L28 (Hz) fs = L25 or L26
Example: L25 = 18 Hz and L28 = 4 Hz; the bandwidth = 18...22 Hz

LECOM power up
state

0

0

Quick stop

1

Inhibit

Serial time-out action

0

0

Not active

Selects controller reaction to serial timeout

1

Inhibit

2

Quick stop

3

Trip fault

Serial fault time

50

50

{ms}

65535 Sets the serial timeout length

Advertising