Figure 15 – Rockwell Automation 20Y PowerFlex Active Front End User Manual

Page 36

Advertising
background image

36

Rockwell Automation Publication 20Y-UM001E-EN-P - July 2014

Chapter 1

AFE in IP20 2500 MCC Style Enclosure—Installation/Wiring

Figure 15 - AFE Frame 13 Power Terminal Locations in IP20 2500 MCC Style Enclosure

Table 3 - AFE Frame 13 Power Terminal Specifications in IP20 2500 MCC Style Enclosure

(Shown with

enclosure doors

and side removed)

FRONT VIEW

RIGHT SIDE VIEW

Item

Name

Frame

Description

Wire Size Range

(1)

(2)

Torque

Terminal Bolt
Size

(3)

(4)

Maximum

Minimum

Recommended

Input Power Terminals
L1, L2, L3

(1)

13

Input power

380 mm

2

(750 MCM)

53 mm

2

(1/O AWG)

50 N•m
(442 lb•in)

N/A

SHLD Terminal, line PE,
Ground

(3)

13

Terminating point for wiring shields

300 mm

2

(600 MCM)

2.1 mm

2

(14 AWG)

40 N•m
(354 lb•in)

M5-M10

SHLD Terminal, motor
PE, Ground

(3)

DC Bus

(3)

(DC–, DC+)

13

DC output (using cable)

380 mm

2

(750 MCM)

2.1 mm

2

(14 AWG)

70 N•m
(620 lb•in)

M12

DC output (using Right Side Splice Kit
SK-Y1-BUSSPLICE-F13R)

40 N•m
(354 lb•in)

M10

DC output (using Left Side Splice Kit
SK-Y1-BUSSPLICE-F13L)

(1) Maximum/minimum sizes that the terminals will accept - these are not recommendations.
(2) Do not exceed maximum wire size. Parallel connections may be required.
(3) These connections are bus bar type terminations and require the use of lug type connectors.
(4) Apply counter torque to the nut on the other side of terminations when tightening or loosening the terminal bolt to avoid damage to the terminal.

Advertising