Technical publications and manuals, Important note for the commissioning engineer – Rockwell Automation 7000 PowerFlex Medium Voltage AC Drive (B Frame) Commissioning - ForGe Control User Manual

Page 25

Advertising
background image

Rockwell Automation Publication 7000-IN012B-EN-P - June 2014

25

Commissioning Preparations Chapter 3

Technical Publications and Manuals

Each drive ships with a service binder containing all technical publications
required to install, use, and troubleshoot the drive line-up. This section describes
how to determine what technical publications are required and how to obtain
them in the event that the service binder is not available when pre-
commissioning, or when you require additional information:

The PowerFlex 7000 Medium Voltage AC Drive Parameters (Publication

7000-TD002_-EN-P

): Use this document for parameter details and

programming during commissioning or troubleshooting.

The PowerFlex 7000 “B” Frame User Manual (

7000-UM202_-EN-P

): Use

this document for general information regarding the usage and
programming of the operator interface after installation (before or after
commissioning.)

Additional Manuals: The electrical schematics that ship with the drive
should list any additional manual necessary for configuring the drive line-
up. The schematic titled “General Notes” identifies all required Rockwell
Automation publications by publication number.

Important Note for the
Commissioning Engineer

The commissioning engineer should review this commissioning package and
follow the defined steps to commission PowerFlex 7000 drive(s). It is the
responsibility of the commissioning engineer to complete all datasheets included
in this package and collect any other relevant information that may not have been
included in the package. Important guidelines for capturing waveforms are also
included in the package for quick reference. These must be reviewed and
followed properly by the commissioning engineer. Anything that is not clear,
please contact MV Tech Support for assistance:

Phone: 519-740-4790
Option 1 for technical and option 4 for commissioning questions

[email protected] or
[email protected]

After successful commissioning of the drive, the commissioning engineer is
required to return the completed commissioning package along with his field
service reports to the project manager within one week after completion of job. If
job is not completed and some data collected it must be sent to project manager
within one week after leaving the site. The items listed below MUST be included
when submitting the commissioning package.

IMPORTANT

Ensure you also have the latest technical and release notes for the relevant
drive firmware before proceeding with commissioning. Check the most recent
version of the Commissioning Guide for a list of updated Tech Notes, available
in the MV intranet site..

Advertising