Input Phasing Check
There are nine voltage test points on the ACB board that will allow you to look at
each voltage level individually.
Table 3 - ACB Test Points and Associated Voltage Signals
The test points are measured to either the Analog Ground (AGND) on the board
or the TE ground in the low voltage section. Use V2uv as your reference (trigger
on this waveform) and verify all the other test points using the table above. It is
easier to use zero crossings on your oscilloscope as the reference points when
checking the phase shifts.
Verify the following relationships:
1.
V and W in each bridge should be lagging U by 120° and 240°, respectively.
2.
3U, 3V, and 3W should be lagging 2U, 2V, and 2W by 20° (-20°),
respectively.
3.
4U, 4V, and 4W should be leading 2U, 2V, and 2W by 20° (+20°),
respectively.
Test Point Description
Isolation Transformer:
Secondary Phasing and Bridge
Phase Relationship
with respect to V2uv
(2U)
V2uv
2u
Master
0
°
V2vw
2v
Master
-120
°
V2wu
2w
Master
-240
°
V3uv
3u
Slave 1
-20
°
V3vw
3v
Slave 1
-140
°
V3wu
3w
Slave 1
-260
°
V4uv
4u
Slave 2
+20
°
V4vw
4v
Slave 2
-100
°
V4wu
4w
Slave 2