Input Phasing Check

There are nine voltage test points on the ACB board that will allow you to look at
each voltage level individually.

Table 3 - ACB Test Points and Associated Voltage Signals

The test points are measured to either the Analog Ground (AGND) on the board
or the TE ground in the low voltage section. Use V2uv as your reference (trigger
on this waveform) and verify all the other test points using the table above. It is
easier to use zero crossings on your oscilloscope as the reference points when
checking the phase shifts.

Verify the following relationships:

1.

V and W in each bridge should be lagging U by 120° and 240°, respectively.

2.

3U, 3V, and 3W should be lagging 2U, 2V, and 2W by 20° (-20°),
respectively.

3.

4U, 4V, and 4W should be leading 2U, 2V, and 2W by 20° (+20°),
respectively.

Test Point Description

Isolation Transformer:
Secondary Phasing and Bridge

Phase Relationship
with respect to V2uv
(2U)

V2uv

2u

Master

0

°

V2vw

2v

Master

-120

°

V2wu

2w

Master

-240

°

V3uv

3u

Slave 1

-20

°

V3vw

3v

Slave 1

-140

°

V3wu

3w

Slave 1

-260

°

V4uv

4u

Slave 2

+20

°

V4vw

4v

Slave 2

-100

°

V4wu

4w

Slave 2

-220

°