Rockwell Automation SB3000 Configuration and Programming User Manual

Page 108

Advertising
background image

E-4

SB3000 Drive Configuration and Programming

Figure E.2 – Pre-Charge Sequencing State Diagram

Control Power On

Pre-charge Contactor is Open

Pre-charge contactor is closed
Report fault (FLT_CHG)

Wait for Pre-charge to Close

Pre-charge times out
Report fault (FLT_CHG)

Pre-charge is closed
& Vdc > Vdiode

Pre-charge Closed - RUN

Pre-charge Closed - TEST

Pre-charge opens
Report fault (FLT_CHG)

Wait to Open

Vdc < Power Loss Threshold

Disable gate
Report fault (FLT_CHG)
Command pre-charge
to open

Pre-charge does not open
Report fault (FLT_CHG)

No charge faults & Vdc > Vdiode

or

Test mode active & Vdc < 5V
Command pre-charge to close

Pre-charge is closed

& Vdc < 5V

& in test mode

Pre-charge opens
Report fault (FLT_CHG)

Bridge test command is set false
Command pre-charge to open

Pre-charge does not open
Report fault (FLT_CHG)