Installation, 1 pre-installation – PLANET EPL-1000 User Manual

Page 15

Advertising
background image

2. Installation


The followings are instructions for setting up PLANET EPL-1000. Refer to the illustration
and follow the simple steps below to quickly install your GEPON OLT.

2.1 Pre-Installation


This section provides the information users have to ware before installing the EPL-1000.
The information includes required installation tools, safety requirements, and electrostatic
discharge protection.

Tools and Test Equipment Requirements


To install and maintain the EPL-1000, you should have the tools and test equipment listed
in the 錯誤! 找不到參照來源。.

Table 2-1 Required Installation Tools and Materials

Item Required

Purpose

Anti-static wrist strap

Protect the EPL-1000 system from electrostatic
discharge damage.

Hand tools

Screw drivers for equipment removal and
replacement.

Wire cutter/stripper

Prepare wires for electrical connections.

Safety Requirement


To prevent possible serious injury, do not apply power to the EPL-1000 system until you’ve
completed all of the installation procedures and connected it to the external facilities. Be
cautious, when turning on/off the EPL-1000 system power.

- 15 -

Advertising