Interpreting isdn bri port status, Interpreting isdn bri port status -22 – Lucent Technologies PortMaster User Manual

Page 206

Advertising
background image

Troubleshooting an ISDN BRI Connection

12-22

PortMaster Configuration Guide

To view the PPP negotiation, enter the following commands:

Command> set console
Command> set debug 0x51

For more information about the interpreting the results of the debug command, refer to
the PortMaster Troubleshooting Guide.

After you verify that the PPP negotiation is correct, enter the following commands to
turn off the debug utility:

Command> set debug off
Command> reset console

Interpreting ISDN BRI Port Status

Table 12-13 describes how to interpret the output of the show S10 command for ISDN
BRI ports.

Table 12-13 ISDN BRI Port Status

Port Status

Modem Status

Description

NO-SERVICE

DCD- CTS- TELCO- NT1-

No SPID is set.

NO-SERVICE

DCD- CTS- TELCO- NT1+

Port has either no cable or no
circuit connecting it to the
telephone company.

NO-SERVICE

DCD- CTS+ TELCO+ NT1+

Cable and ISDN circuit are
functioning, but the SPID is not
registered.

IDLE

DCD- CTS+ TELCO+ NT1+

SPID is registered and ready to use

ESTABLISHED

DCD- CTS+ TELCO+ NT1+

Port is connecting or providing
device service, but no carrier is
sensed.

ESTABLISHED

DCD+ CTS+ TELCO+ NT1+

Port is connected.

ESTABLISHED

DCD+ CTS- TELCO+ NT1+

Port is connected with a V.120
asynchronous connection, but the
other end of the connection is
providing flow control
information.

Advertising