INSTALLATION HAZARD

Depending on the installation orientation of the busways, the following WARNING should always be considered.

VERTICAL BUSWAY INSTALLATION


See Figure 1. For busways installed vertically with channel opening down,
always maintain:

A minimum clearance distance of 6 inches (153 mm) from the top of the
busways to the ceiling and 1 inch (26mm) from the wall.

Parallel runs for two systems mounted in the same area shall have the following
clearances between the systems.

A minimum clearance distance of 6 inches (153 mm) from the center-point of
busway run A to the next run B.

CAUTION

HAZARD OF EQUIPMENT DAMAGE

Always maintain the minimum required clearance distance as shown below.

Failure to follow these instructions may result in equipment damage or personal
injury.

Figure 1 - Vertical Busway Installation

underside of busway

1"

2.5"

5"

18" minimum

6"

ceiling

Top of Server Cabinet

or Equipment

w

all

6"

bus rail A

underside of busway

bus rail B