GE Industrial Solutions GE Zenith Series DPB User Manual

Page 27

Advertising
background image

19

Installation & Operation Manual, GE Series DPB Busway
March 25, 2013, Rev 0

GE Confidential

Series DPB Busway Installation & Operation Manual


11.) Each Dowel Pin has an O-ring set into a small groove on the insertion end of the dowel pin.

(See Figure 15.2).


12.) Position the Dowel Pin into the round port between the first pair (viewed left-to-right, or right-to-left) of

installed white-tipped, slotted Cam Spacers. The conical pointed end is inserted first, and the end with
the O-ring inserted last. (See Figure 15.3)

13.) Using pressure push the Dowel Pin so that it is inserted completely into the Cam Actuator Tool Hole.

(See Figure 15.4)

Figure 15.3 - Positioning of Dowel Pins

Figure 15.4 - Insertion of Dowel Pin

Figure 15.2 - Dowel Pin

O-Ring

Advertising