Installation & Operation Manual, GE Series DPB Busway
March 25, 2013, Rev 0

GE Confidential

Series DPB Busway Installation & Operation Manual

ACCUMULATOR PCB

All communications (power data) from the
Tap Off Boxes are transmitted through the
Accumulator Board (Figure 25). The board
is equipped with a RS-485 serial Modbus
communications serial interface capable of
two-wire or four-wire communications. Refer to
Section "Communications" for details on how to
interface with the serial port for connection to
Building Management Systems (BMS),
Data Center Infrastructure Solutions (DCIM) or
Local Displays.

POWER INSERTER PCB

DC power for all related circuit boards of the Bus
Monitoring System is supplied through the Power
Inserter Board (Figure 26) located inside the BCMS
Monitoring Module on the End Feed Box. The Power
Inserter Board acquires AC power via a readily accessible
disconnect device directly from the End Feed main AC
input bus. It provides a 24 VDC source along the bus rail
communications cable to power the intelliBUS (Branch
Monitoring) circuit boards in Tap Off Boxes. It is important
that the Power Inserter be configured for the correct
AC input voltage. See Table 1. For the correct jumper
configuration for jumper J2 and J5 located on the Power
Inserter Board.

The input power inserter is always fused with Type KTK-R fuses rated at 0.5A.

480 VAC

380VAC

240VAC

208VAC

J2

2 to 3

2 to 3

1 to 2 and 3 to 4 1 to 2 and 3 to 4

J5

2 to 3

1 to 2 and 3 to 4

2 to 3

1 to 2 and 3 to 4

Table 1 - Power Supply Input Voltage Configuration

J6 Modbus

Serial Output

J8 USB Port

J5 Modbus

Serial Input

J2 Voltage

Configuration

J5 Voltage

Configuration

Figure 25 - Accumulator PCB

Figure 26 - Power Inserter PCB

1 2 3 4