GE Industrial Solutions GE Zenith Series DPB User Manual

Page 65

Advertising
background image

57

Installation & Operation Manual, GE Series DPB Busway
March 25, 2013, Rev 0

GE Confidential

Series DPB Busway Installation & Operation Manual

MODBUS CONNECTION

Connecting the Local Display to the busway is achieved by daisy-chaning up to 6 End Feed Accumulator PCBs via
Connection TB3 (see Figures 53). A total of 15 Tap Off Boxes per End Feed can be addressed on the display providing a
maximum of 96 power points that can be monitored. Connecting the Series DPB Local Display to a building management
system utilizes Connector TB4.

TB3

TB4

Building

Management

System

Series DPB Bus Systems

Series DPB Bus Systems

7" Local Display

Figure 53 - Modbus Wiring Diagram

End Feed Accumulator PCB

Advertising